Going to Production - Final Checklist

📋 Pre-Production Planning

1. Infrastructure Decision

  • Choose deployment platform:
    • VPS (DigitalOcean, Linode, AWS EC2)
    • Kubernetes (EKS, GKE, AKS)
    • Managed services (AWS Lightsail, Heroku)
    • On-premises
  • Estimate monthly cost
  • Plan scaling strategy
  • Choose database provider (RDS, Cloud SQL, self-hosted)
  • Choose cache provider (ElastiCache, Redis Cloud, self-hosted)

2. Security Audit

  • All secrets moved to environment variables
  • No credentials in source code
  • HTTPS/TLS configured
  • Firewall rules set up
  • DDoS protection enabled (if needed)
  • Rate limiting configured
  • Input validation implemented
  • Database backups configured
  • Access logs enabled
  • Regular security scanning enabled

3. Monitoring Setup

  • Logging aggregation configured (ELK, Datadog, CloudWatch)
  • Metrics collection enabled (Prometheus, Datadog, CloudWatch)
  • Alerting configured for critical issues
  • Health check endpoints implemented
  • Uptime monitoring service activated
  • Performance baseline established
  • Error tracking enabled (Sentry, Rollbar)

4. Backup & Recovery

  • Daily automated database backups
  • Backup storage in different region
  • Backup verification automated
  • Recovery procedure documented
  • Recovery tested successfully
  • Retention policy defined (7-30 days)
  • Point-in-time recovery possible

5. Testing

  • Load testing completed
  • Failover testing done
  • Disaster recovery tested
  • Security testing done
  • Performance benchmarks established
  • Compatibility testing across devices
  • Integration testing with Telegram API

🔧 Infrastructure Preparation

1. VPS/Server Setup (if using VPS)

# Update system
sudo apt update && sudo apt upgrade -y

# Install Docker
curl -fsSL https://get.docker.com -o get-docker.sh
sudo sh get-docker.sh

# Install Docker Compose
sudo curl -L "https://github.com/docker/compose/releases/latest/download/docker-compose-$(uname -s)-$(uname -m)" -o /usr/local/bin/docker-compose
sudo chmod +x /usr/local/bin/docker-compose

# Create non-root user
sudo useradd -m -s /bin/bash bot_user
sudo usermod -aG docker bot_user

2. Domain Setup (if using custom domain)

  • Domain purchased and configured
  • DNS records pointing to server
  • SSL certificate obtained (Let's Encrypt)
  • HTTPS configured
  • Redirect HTTP to HTTPS

3. Database Preparation

  • PostgreSQL configured for production
  • Connection pooling configured
  • Backup strategy implemented
  • Indexes optimized
  • WAL archiving enabled
  • Streaming replication configured (if HA needed)
  • Maximum connections appropriate

4. Cache Layer Setup

  • Redis configured for production
  • Persistence enabled
  • Password set
  • Memory limit configured
  • Eviction policy set
  • Monitoring enabled

5. Network Configuration

  • Firewall rules configured
    • Allow port 443 (HTTPS)
    • Allow port 80 (HTTP redirect)
    • Restrict SSH to specific IPs (if possible)
    • Restrict database access to app servers
  • VPN configured (if needed)
  • Load balancer set up (if multiple servers)
  • CDN configured (if needed)

📝 Configuration Finalization

1. Environment Variables

  • All production credentials configured
  • Telegram bot token verified
  • Database credentials secure
  • Redis password strong
  • API keys rotated
  • Feature flags set correctly
  • Logging level set to INFO
  • Debug mode disabled

2. Application Configuration

# Critical for Production
DEBUG=False
LOG_LEVEL=INFO
ENVIRONMENT=production
ALLOWED_HOSTS=yourdomain.com
CORS_ORIGINS=yourdomain.com

# Database
DB_POOL_SIZE=30
DB_MAX_OVERFLOW=10
DB_POOL_TIMEOUT=30

# Security
SECRET_KEY=generated_strong_key
SECURE_SSL_REDIRECT=True
SESSION_COOKIE_SECURE=True
CSRF_COOKIE_SECURE=True

# Rate Limiting
RATE_LIMIT_ENABLED=True
RATE_LIMIT_PER_MINUTE=100

3. Logging Configuration

  • Log rotation enabled
  • Log aggregation configured
  • Error logging enabled
  • Access logging enabled
  • Performance logging enabled
  • Sensitive data not logged

4. Monitoring Configuration

# prometheus.yml or similar
scrape_configs:
  - job_name: 'telegram_bot'
    static_configs:
      - targets: ['localhost:8000']
    scrape_interval: 15s
  • Metrics collection configured
  • Alert rules defined
  • Dashboard created
  • Notification channels configured

🚀 Deployment Execution

1. Final Testing

# Test in staging
docker-compose -f docker-compose.yml -f docker-compose.prod.yml up -d

# Run migrations
docker-compose exec bot alembic upgrade head

# Test bot functionality
# - Create test message
# - Test broadcast
# - Test scheduling
# - Monitor Flower dashboard
# - Check logs for errors

# Load testing
# - Send 100+ messages
# - Monitor resource usage
# - Check response times

2. Deployment Steps

# 1. Pull latest code
git pull origin main

# 2. Build images
docker-compose build

# 3. Start services
docker-compose -f docker-compose.yml -f docker-compose.prod.yml up -d

# 4. Run migrations
docker-compose exec bot alembic upgrade head

# 5. Verify services
docker-compose ps

# 6. Check logs
docker-compose logs -f

# 7. Health check
curl http://localhost:5555  # Flower

3. Post-Deployment Verification

# Database
docker-compose exec postgres psql -U bot -d tg_autoposter -c "SELECT version();"

# Redis
docker-compose exec redis redis-cli ping

# Bot
docker-compose logs bot --tail 20 | grep -i error

# Celery Workers
docker-compose logs celery_worker_send --tail 10

# Flower
# Check http://yourdomain.com:5555

📊 Post-Launch Monitoring

1. First Week Monitoring

  • Monitor resource usage hourly
  • Check error logs daily
  • Review performance metrics
  • Test backup/restore procedures
  • Monitor bot responsiveness
  • Check Flower for failed tasks
  • Verify database is growing normally
  • Monitor network traffic

2. Ongoing Monitoring

  • Set up automated alerts
  • Daily log review (automated)
  • Weekly performance review
  • Monthly cost analysis
  • Quarterly security audit
  • Backup verification (weekly)
  • Dependency updates (monthly)

3. Maintenance Schedule

Daily:   Check logs, monitor uptime
Weekly:  Review metrics, test backups
Monthly: Security scan, update dependencies
Quarterly: Full security audit, capacity planning

🔒 Security Hardening

1. Application Security

  • Enable HTTPS only
  • Set security headers
  • Implement rate limiting
  • Enable CORS properly
  • Validate all inputs
  • Use parameterized queries (already done with SQLAlchemy)
  • Hash sensitive data
  • Encrypt sensitive fields (optional)

2. Infrastructure Security

  • Firewall configured
  • SSH key-based auth only
  • Fail2ban or similar enabled
  • Regular security updates
  • No unnecessary services running
  • Minimal privileges for services
  • Network segmentation

3. Data Security

  • Encrypted backups
  • Encrypted in-transit (HTTPS)
  • Encrypted at-rest (database)
  • PII handling policy
  • Data retention policy
  • GDPR/privacy compliance
  • Regular penetration testing

📈 Scaling Strategy

When to Scale

  • Response time > 2 seconds
  • CPU usage consistently > 80%
  • Memory usage consistently > 80%
  • Queue backlog growing
  • Error rate increasing
  • During peak usage times

Horizontal Scaling

# Add more workers to docker-compose.prod.yml
# Example: 2 extra send workers

services:
  celery_worker_send_1:
    # existing config
    
  celery_worker_send_2:
    # duplicate and modify
    container_name: tg_autoposter_worker_send_prod_2
    
  celery_worker_send_3:
    # duplicate and modify
    container_name: tg_autoposter_worker_send_prod_3

Vertical Scaling

  • Increase docker resource limits
  • Increase database memory
  • Increase Redis memory
  • Optimize queries and code

Database Scaling

  • Read replicas for read-heavy workloads
  • Connection pooling
  • Query optimization
  • Caching layer (already implemented)
  • Partitioning large tables (if needed)

📞 Support & Escalation

Support Channels

  • GitHub Issues for bugs
  • GitHub Discussions for questions
  • Email for critical issues
  • Slack/Discord channel (optional)

Escalation Path

  1. Check logs and metrics
  2. Review documentation
  3. Search GitHub issues
  4. Ask in GitHub discussions
  5. Contact maintainers
  6. Professional support (if available)

Production Readiness Checklist

Code Quality

  • All tests passing
  • No linting errors
  • No type checking errors
  • Code coverage > 60%
  • No deprecated dependencies
  • Security vulnerabilities fixed

Infrastructure

  • All services healthy
  • Database optimized
  • Cache configured
  • Monitoring active
  • Backups working
  • Disaster recovery tested

Documentation

  • Deployment guide updated
  • Runbooks created
  • Troubleshooting guide complete
  • API documentation ready
  • Team trained

Compliance

  • Security audit passed
  • Privacy policy updated
  • Terms of service updated
  • GDPR compliance checked
  • Data handling policy defined

🎯 First Day Production Checklist

Morning

  • Check all services are running
  • Review overnight logs
  • Check error rates
  • Verify backups completed
  • Check resource usage

During Day

  • Monitor closely
  • Be ready to rollback
  • Test key functionality
  • Monitor user feedback
  • Check metrics frequently

Evening

  • Review daily summary
  • Document any issues
  • Verify backups again
  • Plan for day 2
  • Update runbooks if needed

🚨 Rollback Plan

If critical issues occur:

# Immediate: Stop new deployments
git reset --hard HEAD~1

# Rollback to previous version
docker-compose down
docker system prune -a
git checkout previous-tag
docker-compose up -d

# Run migrations (backward if needed)
docker-compose exec bot alembic downgrade -1

# Verify
docker-compose ps
docker-compose logs

📅 Post-Launch Review

Schedule review at:

  • 1 week post-launch
  • 1 month post-launch
  • 3 months post-launch

Review points:

  • Stability and uptime
  • Performance vs baseline
  • Cost analysis
  • User feedback
  • Scaling needs
  • Security incidents (if any)
  • Team feedback

🎉 Success Criteria

You're ready for production when:

  • All tests passing
  • Security audit passed
  • Monitoring in place
  • Backups verified
  • Team trained
  • Documentation complete
  • Staging deployment successful
  • Load testing completed
  • Disaster recovery tested
  • Post-launch plan ready

📞 Emergency Contacts

Create a contact list:

  • Tech lead: _________________
  • DevOps engineer: _________________
  • Database admin: _________________
  • Security officer: _________________
  • On-call rotation: _________________

Document Version: 1.0
Last Updated: 2024-01-01
Status: Production Ready

Remember: Production is not a destination, it's a continuous journey of monitoring, optimization, and improvement. Stay vigilant and keep learning!